Module 11 · Lesson 6 of 13
Improve submission pack
Learning objectives
- Assemble an Improve submission pack with tested solutions.
- Screen solutions against CTQ, safety and compliance gates.
- Predefine pilot success, stop rules and rollback.
Required evidence
- Idea log traced to vital Xs
- CTQ, safety and compliance gates
- Decision / Pugh / AHP as suitable
- Solution FMEA
- DOE or pilot protocol and results
- Effect size and confidence interval
- Guardrails and cost-benefit
- Future-state map
- Implementation and rollback plan
Copy-friendly Improve pack checklist
- Ideas linked to a specific X
- Mandatory gates applied before ranking
- Pilot success and stop criteria pre-set
- Rollback plan defined and rehearsed
- Cost-benefit refreshed after pilot
Garment-factory example
For seam-damage, method change, needle-life SOP and an automation option are compared; the top combination is piloted on two representative styles across two shifts with predefined stop rules for output loss.
Method
- Screen with mandatory criteria before scoring preferences.
- Pre-register pilot rules to prevent post-hoc reinterpretation.
- Document deviations and learning, not only successes.
Common mistakes
- Selecting the favourite idea without screening.
- Scaling a short favourable trial.
- Ignoring output or ergonomic guardrails.
Knowledge check
Pick one answer per question. Explanations appear after you submit.
1. Pilot success criteria must be:
2. A solution passes Improve gates when:
Author: Sanjeewa Dehiwalage · Last reviewed: 2026-07-21