Module 11 · Lesson 6 of 13

Improve submission pack

← Back to moduleBack to academy

Learning objectives

  • Assemble an Improve submission pack with tested solutions.
  • Screen solutions against CTQ, safety and compliance gates.
  • Predefine pilot success, stop rules and rollback.

Required evidence

  • Idea log traced to vital Xs
  • CTQ, safety and compliance gates
  • Decision / Pugh / AHP as suitable
  • Solution FMEA
  • DOE or pilot protocol and results
  • Effect size and confidence interval
  • Guardrails and cost-benefit
  • Future-state map
  • Implementation and rollback plan

Copy-friendly Improve pack checklist

  • Ideas linked to a specific X
  • Mandatory gates applied before ranking
  • Pilot success and stop criteria pre-set
  • Rollback plan defined and rehearsed
  • Cost-benefit refreshed after pilot

Garment-factory example

For seam-damage, method change, needle-life SOP and an automation option are compared; the top combination is piloted on two representative styles across two shifts with predefined stop rules for output loss.

Method

  1. Screen with mandatory criteria before scoring preferences.
  2. Pre-register pilot rules to prevent post-hoc reinterpretation.
  3. Document deviations and learning, not only successes.

Common mistakes

  • Selecting the favourite idea without screening.
  • Scaling a short favourable trial.
  • Ignoring output or ergonomic guardrails.

Knowledge check

Pick one answer per question. Explanations appear after you submit.

  1. 1. Pilot success criteria must be:

  2. 2. A solution passes Improve gates when:

Author: Sanjeewa Dehiwalage · Last reviewed: 2026-07-21

Stay in touch

New chapters, delivered quietly.

A short note when a new story, reflection or milestone is added. No noise, no spam — unsubscribe with a single click.