Module 11 · Lesson 7 of 13

Control submission pack

← Back to moduleBack to academy

Learning objectives

  • Assemble a Control submission pack that sustains the gain.
  • Prove ownership transfer to the process owner.
  • Show validated benefits and a working reaction plan.

Required evidence

  • Control plan
  • SOP and standard work
  • Poka-yoke or robust design
  • Visual triggers and reaction plan
  • SPC where valid
  • Repeat MSA
  • Sustained capability
  • Training and adoption evidence
  • Validated benefits
  • Handover, audit cadence and CAPA route

Copy-friendly Control pack checklist

  • Control plan lists owner, frequency, record, trigger, reaction and escalation
  • Reaction plan challenge-tested
  • Competence confirmed (not just attendance)
  • Sustained performance across representative period
  • Process owner accepts handover in writing

Garment-factory example

A needle-life control specifies owner, replacement frequency, log record, abnormal-trigger response, containment, correction, restart and escalation across all shifts. The plan is challenge-tested with a deliberate abnormality before closure.

Method

  1. Co-design controls with process owner and operators.
  2. Confirm competence through observed performance.
  3. Monitor for a representative duration before closure.

Common mistakes

  • Closing on pilot data.
  • Documents that differ from actual gemba practice.
  • Treating training attendance as competence.

Knowledge check

Pick one answer per question. Explanations appear after you submit.

  1. 1. A control is only useful when it has:

  2. 2. Handover is complete when: