Module 11 · Lesson 7 of 13
Control submission pack
Learning objectives
- Assemble a Control submission pack that sustains the gain.
- Prove ownership transfer to the process owner.
- Show validated benefits and a working reaction plan.
Required evidence
- Control plan
- SOP and standard work
- Poka-yoke or robust design
- Visual triggers and reaction plan
- SPC where valid
- Repeat MSA
- Sustained capability
- Training and adoption evidence
- Validated benefits
- Handover, audit cadence and CAPA route
Copy-friendly Control pack checklist
- Control plan lists owner, frequency, record, trigger, reaction and escalation
- Reaction plan challenge-tested
- Competence confirmed (not just attendance)
- Sustained performance across representative period
- Process owner accepts handover in writing
Garment-factory example
A needle-life control specifies owner, replacement frequency, log record, abnormal-trigger response, containment, correction, restart and escalation across all shifts. The plan is challenge-tested with a deliberate abnormality before closure.
Method
- Co-design controls with process owner and operators.
- Confirm competence through observed performance.
- Monitor for a representative duration before closure.
Common mistakes
- Closing on pilot data.
- Documents that differ from actual gemba practice.
- Treating training attendance as competence.
Knowledge check
Pick one answer per question. Explanations appear after you submit.
1. A control is only useful when it has:
2. Handover is complete when:
Author: Sanjeewa Dehiwalage · Last reviewed: 2026-07-21