Module 7 · Lesson 12 of 24

Little’s Law and process-cycle efficiency

← Back to moduleBack to academy

Learning objectives

  • Explain the purpose of little's law and process-cycle efficiency in garment operations.
  • Describe when and how to apply little's law and process-cycle efficiency on the shop floor.
  • Identify common mistakes and how to avoid them.

Core idea

In a stable system, WIP = throughput x lead time; process-cycle efficiency = value-added time / total lead time x 100%.

Method

Use the same system boundary, period, and units; validate approximate stability; reduce queues and retest. Do not use the equation as exact during major demand/backlog change.

Garment-factory example

1,200 garments WIP / 600 garments per day = 2 days average lead time; 80 minutes value-added over 1,200 minutes elapsed = 6.7% PCE.

Method

  1. Use the same system boundary, period, and units;
  2. validate approximate stability;
  3. reduce queues and retest

Common mistakes

  • Do not use the equation as exact during major demand/backlog change

Knowledge check

Pick one answer per question. Explanations appear after you submit.

  1. 1. Which statement best captures the core idea of Little's Law and process-cycle efficiency?

  2. 2. A common mistake when applying little's law and process-cycle efficiency is to:

Author: Sanjeewa Dehiwalage · Last reviewed: 2026-07-21