Module 10 · Lesson 17 of 18
Supplier quality improvement
Learning objectives
- Define supplier CTQs and the correct denominator per material family.
- Rank suppliers on like-for-like PPM, capability, delivery and response.
- Design supplier development that prevents defects, not just inspects them.
Problem and CTQ
Incoming fabric, trims, chemicals and service performance drive defects, delay and variability. Ranking suppliers requires like-for-like materials and validated data.
DMAIC path
- Define supplier CTQs and denominator.
- Validate incoming and use-stage data and traceability.
- Stratify supplier/item/lot/time; compare PPM, capability, delivery and response.
- Confirm causes jointly with the supplier.
Improvement choices
- Clear specifications and measurement method.
- Sample approval and process capability plan.
- Corrective action, early-warning data and supplier development.
Control plan
- Supplier PPM, lot acceptance, on-time delivery, SCAR closure and effectiveness, repeat issue, line disruption and total cost.
Garment-factory example
Two twill suppliers run at PPM 5,200 and PPM 8,900 on shade delta; deeper look shows the second supplies a stripe fabric with stricter matching. Comparing only plain fabric lots, the two suppliers are within 300 PPM of each other, and the joint action shifts to matching tolerance.
Common mistakes
- Ranking unlike materials on raw counts.
- Relying on incoming inspection instead of supplier process control.
Knowledge check
Pick one answer per question. Explanations appear after you submit.
1. A fair supplier PPM comparison requires:
2. Sustainable supplier improvement comes primarily from:
Author: Sanjeewa Dehiwalage · Last reviewed: 2026-07-21