Learning objectives

  • Compute OEE with honest ideal cycle and good count.
  • Separate availability, performance and quality losses.
  • Focus improvement on the constraint machine, not every machine.

Problem and CTQ

OEE = availability × performance × quality. Equipment losses reduce capacity and disrupt flow, but only losses at the constraint move throughput.

DMAIC path

  • Define planned time and loss codes.
  • Validate timestamps, ideal rate and good count.
  • Pareto breakdown, minor stops, speed loss, setup and defects; compute MTBF and MTTR.

Improvement choices

  • Autonomous and planned maintenance.
  • Critical spares, centerlining, response escalation and condition checks.
  • Failure-mode actions on repeat causes.

Control plan

  • OEE and its three factors, downtime minutes, MTBF, MTTR, repeat failure, schedule compliance and throughput at the constraint.

Garment-factory example

A bar-tack machine at the constraint runs at 58% OEE (Availability 82%, Performance 88%, Quality 80%). A 30-minute daily condition check plus a spare-parts kit lifts OEE to 74% and adds 210 shirts/day at the same line count.

Common mistakes

  • Using OEE to judge operators.
  • Inflating the ideal cycle to make OEE look worse (or better).

Knowledge check

Pick one answer per question. Explanations appear after you submit.

  1. 1. OEE at 90% for a non-constraint machine means:

  2. 2. The correct ideal cycle is: