Module 10 · Lesson 6 of 18
First-Time-Right and DHU reduction
Learning objectives
- Define FTR and DHU with matching numerators and denominators.
- Locate the vital few defect drivers by operation, hour and material.
- Design quality-at-source controls that reduce defects without slowing output.
Problem and CTQ
FTR = first-pass accepted / first-pass inspected × 100%. DHU = defects / units inspected × 100. Align inspector agreement before publishing either number.
DMAIC path
- Attribute agreement and inspector calibration.
- Pareto by operation, defect type, hour, operator, machine and material.
- Analyse exposure and time sequence; confirm cause at gemba.
Improvement choices
- Quality-at-source, first-piece approval and standardized method/settings.
- Defect references, needle/thread controls and targeted poka-yoke.
- Feedback loops from downstream inspection back to source operation.
Control plan
- FTR/FPY, DHU, repair minutes, repeat defect, audit agreement, output and cost of poor quality.
- Owner per top defect with a weekly repeat-defect review.
Garment-factory example
A denim line records 14.2 DHU driven by two defects: skip-stitch on waistband and needle marks on back-yoke. Needle-change frequency and a pressure setting standard cut DHU to 6.8 in six weeks without output loss.
Common mistakes
- Confusing defects with defective garments.
- Gaming FTR by pre-inspecting and repairing before the checkpoint.
Knowledge check
Pick one answer per question. Explanations appear after you submit.
1. DHU is:
2. Pre-inspecting to raise FTR is: