Module 6 · Lesson 16 of 17

Post-project audit and response plan

← Back to moduleBack to academy

Learning objectives

  • Explain the purpose of post-project audit and response plan in a garment-factory improvement project.
  • Apply the described method to a representative shop-floor situation.
  • Recognize the common mistakes and how to avoid them.

Concept

Scheduled audits test whether results, controls, behaviors, documentation, and benefits persist after the project team exits.

Audit leading X controls and lagging Y/benefit results at 30/60/90-day or risk-based intervals.

Review process adherence, chart response, gauge, training, maintenance, risks, and change history.

Garment-factory example

Audit seam-damage controls across shifts and new operators; verify replacement records, chart signals, defect level, and response time.

Method

  1. Assign an independent auditor.
  2. Sample evidence and observe work.
  3. Rate gaps.
  4. Contain serious risks immediately.
  5. Assign CAPA.
  6. Verify effectiveness.
  7. Escalate chronic regression.

Common mistakes

  • Document-only audits with no observation at the workstation.
  • Treating audit score as more important than actual risk.

Knowledge check

Pick one answer per question. Explanations appear after you submit.

  1. 1. Audits should be primarily:

  2. 2. Findings require:

Author: Sanjeewa Dehiwalage · Last reviewed: 2026-07-21