Module 7 · Lesson 4 of 24

The seven wastes plus unused human potential

← Back to moduleBack to academy

Learning objectives

  • Explain the purpose of the seven wastes plus unused human potential in garment operations.
  • Describe when and how to apply the seven wastes plus unused human potential on the shop floor.
  • Identify common mistakes and how to avoid them.

Core idea

Transportation, inventory, motion, waiting, overproduction, overprocessing, defects, and unused human potential consume resources without customer value.

Method

Use specific observable examples and data; trace systemic causes. Do not blame people or treat all inventory as equally avoidable.

Garment-factory example

Excess bundle travel, WIP racks, reaching, machine waiting, early production, duplicate inspection, repairs, and ignored operator ideas.

Method

  1. Use specific observable examples and data;
  2. trace systemic causes

Common mistakes

  • Do not blame people or treat all inventory as equally avoidable

Knowledge check

Pick one answer per question. Explanations appear after you submit.

  1. 1. Which statement best captures the core idea of The seven wastes plus unused human potential?

  2. 2. A common mistake when applying the seven wastes plus unused human potential is to:

Author: Sanjeewa Dehiwalage · Last reviewed: 2026-07-21

Stay in touch

New chapters, delivered quietly.

A short note when a new story, reflection or milestone is added. No noise, no spam — unsubscribe with a single click.