Module 5 · Lesson 13 of 17

Pilot design and success criteria

← Back to moduleBack to academy

Learning objectives

  • Explain the purpose of pilot design and success criteria in a garment-factory improvement project.
  • Apply the described method to a representative shop-floor situation.
  • Recognize the common mistakes and how to avoid them.

Concept

A pilot tests both solution effectiveness and the practicality of full implementation at controlled scale.

Specify baseline/control, duration, representative variation, sample, owners, training, monitoring, reversibility, acceptance thresholds, unintended consequences, and rollout questions.

Pilot criteria are agreed before results are seen, in writing.

Garment-factory example

Pilot a new inline quality gate on one representative line across two styles and shifts, monitoring DHU, FPY, output, repair minutes, and operator burden.

Method

  1. Charter the pilot.
  2. Select representative site.
  3. Lock operational definitions.
  4. Train staff.
  5. Collect baseline.
  6. Run pilot.
  7. Daily review without changing rules mid-flight.
  8. Document deviations.

Common mistakes

  • Choosing the easiest line only.
  • Declaring success from a short favorable window.

Knowledge check

Pick one answer per question. Explanations appear after you submit.

  1. 1. Pilot success criteria must be set:

  2. 2. A representative pilot line captures:

Author: Sanjeewa Dehiwalage · Last reviewed: 2026-07-21