Module 1 · Lesson 5 of 14
DMAIC lifecycle and phase gates
Learning objectives
- State the purpose of each DMAIC phase.
- List the deliverables required at each tollgate.
- Explain how tollgate governance prevents premature solutions.
The five gates
- Define — scope the customer problem and authorize the project.
- Measure — validate measurement and establish baseline.
- Analyze — confirm root causes with evidence.
- Improve — develop, pilot and select solutions.
- Control — sustain the result and hand over ownership.
Garment-factory example
A high-rework project cannot jump to retraining. The team must first define the defect, validate inspection agreement, establish DHU and confirm causal factors before choosing a solution.
Method
- Agree exit criteria for each gate up front.
- Bring documented evidence to every review.
- Only proceed when the sponsor and process owner accept the deliverables.
Common mistakes
- Using DMAIC as a document checklist.
- Choosing a solution during Define.
Knowledge check
Pick one answer per question. Explanations appear after you submit.
1. Where does measurement-system confidence belong?
2. Control includes:
Author: Sanjeewa Dehiwalage · Last reviewed: 2026-07-21