Module 2 · Lesson 16 of 16
Define tollgate and garment project exercise
Learning objectives
- Confirm Define deliverables are complete and consistent.
- Defend the project logic in front of a sponsor.
- Identify readiness gaps before Measure begins.
Scenario used for this tollgate
A knit factory faces buyer complaints about measurement inconsistency, rising final-inspection failures, growing repair volume and shipment risk across three similar styles.
Required outputs to defend
- Evidence-based problem and SMART goal.
- Customer/VOC summary and CTQs.
- Scope, charter and stakeholder plan.
- Benefit hypothesis, SIPOC and high-level current-state map.
- The specific Measure-phase questions.
Gate questions the sponsor will ask
- Is the defect operationally clear?
- Does scope match authority and available time?
- Is the baseline source credible enough to proceed?
- Are sponsor, process owner, resources and guardrails confirmed?
Garment-factory example
Presenting root causes as facts at this gate is a red flag — Define has not tested causes yet, and doing so tells the sponsor the belt does not know where they are in DMAIC.
Method
- Assemble every mandatory Define deliverable.
- Resolve contradictions between charter, VOC and SIPOC.
- Label assumptions clearly.
- Obtain and record sponsor and process-owner approval.
Common mistakes
- Presenting suspected causes as proven facts.
- Approving a project without a reliable measurement plan.
Knowledge check
Pick one answer per question. Explanations appear after you submit.
1. At the Define tollgate, root causes should be:
2. A project without a reliable measurement plan should be:
Author: Sanjeewa Dehiwalage · Last reviewed: 2026-07-21