Concept

Control holds the gain by transferring monitoring, response, ownership, and evidence to the process, not the project team.

Success is stable performance under representative variation with a demonstrated abnormal-response drill.

Ownership sits with a named process role — never with the departing Black Belt.

Garment-factory example

After a seam-damage pilot succeeds, the line owner accepts control plan, SPC, standard work, poka-yoke, training, audit, and CAPA route before project closure.

Method

  1. Assign process owner.
  2. Freeze control plan.
  3. Confirm training and adoption.
  4. Run abnormal-response drill.
  5. Schedule audits and MSA repeat.
  6. Close project only after handover acceptance.

Common mistakes

  • Closing when only the project leader can operate the process.
  • Leaving temporary pilot controls in place after rollout.

Knowledge check

Pick one answer per question. Explanations appear after you submit.

  1. 1. Control ownership must sit with:

  2. 2. A demonstrated abnormal-response drill proves:

Author: Sanjeewa Dehiwalage · Last reviewed: 2026-07-21

Stay in touch

New chapters, delivered quietly.

A short note when a new story, reflection or milestone is added. No noise, no spam — unsubscribe with a single click.