Capacity is not the number of lines you have; it is the number of good minutes the bottleneck operation can produce. If the bottleneck stops, the whole floor stops.
A buffer is planned idle time before a commitment, not an excuse for poor discipline. Used correctly, it absorbs normal variation without breaking the ship date.